2010

Didn't have much available time this year with work, but managed to add a hot water heater:


Some insulation covering the hull by the main salon bunks with 1" polyurethane, then formica. Also 1/2" thick cork tiles on the sides of the cabin trunk.

Made a nice fold down table in the main cabin, after struggling to come up with a design that was simple and quick to put up and take down. This simple fold up takes about 5 seconds to fold down and put away.

Monika sewed cushions for the main salon, so its getting more comfortable.

Couldn't get away from work at the end of August for trip to Astoria that we had planned, but we got lucky with some nice weather the first week of October, and were able to go.

Passing under the Longiew bridge on the Columbia river:

...and here is that colorful area at Cathlamet we like.

Near the Sauvie's Island bridge in Multnomah channel on the return trip home: